Complete Pharmaceutical Water System Solution

Contact sales

Complete Pharmaceutical Water System Solution

Construction Team · Plant Construction · Automated Water Quality Monitoring


I. Service Overview

We provide end-to-end lifecycle services from design, construction, validation to operation and maintenance, delivering GMP-compliant Purified Water and Water for Injection (WFI) systems for pharmaceutical manufacturers. With our professional construction team, proven plant construction solutions, and intelligent water quality monitoring platform, we ensure your pharmaceutical water system remains stable, compliant, and efficient from construction through ongoing operation.


II. Professional Construction Team

2.1 Team Qualifications


QualificationDescription
Mechanical & Electrical InstallationClass I/II Mechanical & Electrical Installation Engineering Contracting Qualification
Clean Piping ConstructionASME BPE certified, GMP-compliant clean piping installation capability
Welding CertificationCertified welders with ASME/ISO credentials
GMP Validation TeamDedicated validation engineers managing DQ/IQ/OQ/PQ throughout the project

2.2 Construction Capabilities


CapabilityDetails
Process Piping Installation316L stainless steel clean piping, fully automatic orbital welding, borescope inspection, traceable welding records
Equipment InstallationPrecision installation of water purification systems, storage tanks, distribution systems, and ancillary equipment
Electrical & Controls InstallationPLC panels, instrumentation, sensors, and SCADA system wiring and commissioning
Cleanroom ConstructionGMP-compliant installation for Class D/C cleanroom environments
Schedule ManagementProject-based management with strict timeline control to ensure on-time delivery

2.3 Construction Quality Assurance

  • Full Quality Control Process: Material incoming inspection, weld quality testing, pressure testing, passivation, borescope inspection
  • Traceable Documentation: Complete as-built documentation including material certificates, weld records, test reports, and drawings
  • Safe Construction Practices: Strict on-site safety management to ensure concurrent production and construction safety

III. Plant Construction Solutions

3.1 Scope of Services

We provide end-to-end plant construction support from planning to delivery, suitable for new pharmaceutical plants, facility expansions, and water system upgrades.


PhaseServices
Project InitiationRequirements assessment, URS development, feasibility analysis, budget estimation
Design PhaseProcess flow diagrams, equipment layout, piping design, control strategy, 3D modeling
Procurement PhaseEquipment selection, supplier qualification, procurement contract management
Construction PhaseOn-site construction, progress management, quality control, safety supervision
Commissioning PhaseSingle equipment testing, system integration testing, parameter optimization
Validation PhaseFull DQ/IQ/OQ/PQ validation, protocol development and execution
Handover PhaseAs-built documentation, personnel training, operation and maintenance handover

3.2 Customized Plant Solutions

Tailored solutions for different pharmaceutical applications:


Pharmaceutical TypeSolution Features
BiopharmaceuticalsHigh-purity water (RO+EDI+Ultrafiltration), full 316L material, hot-loop circulation, endotoxin control
Chemical PharmaceuticalsHigh-capacity systems, enhanced pretreatment, concentrate recovery, corrosion-resistant materials
Traditional Chinese MedicineEnhanced organic matter removal, microbial control, pasteurization systems
Solid Dosage FormsEconomical purified water systems, modular design, rapid installation and delivery
Medical DevicesSegregated water supply systems, multiple point-of-use, IoT-based control

3.3 Project Timeline Reference


Project ScaleDesignConstructionCommissioning & ValidationTotal
Small System (≤1 t/h)2-3 weeks4-6 weeks2-3 weeks8-12 weeks
Medium System (1-5 t/h)3-4 weeks6-10 weeks3-4 weeks12-18 weeks
Large System (≥5 t/h)4-6 weeks10-16 weeks4-6 weeks18-28 weeks
Timelines are estimates and may vary based on site conditions and specific requirements.

IV. Automated Water Quality Monitoring Solution

4.1 System Architecture

Our intelligent water quality monitoring platform enables real-time monitoring, data logging, alerting, and trend analysis to ensure consistent water quality compliance.

text

Sensor Layer → Data Acquisition → Data Transmission → Platform Application → User Interface
      ↓              ↓                 ↓                    ↓                    ↓
Conductivity      PLC/RTU           4G/Ethernet         SCADA System         PC Client
TOC               Data Gateway       WiFi                Database            Mobile App
Temperature       Acquisition                        Web Platform          SMS/Email
Pressure          Module                             Big Data Analytics    Alert Push
Flow

4.2 Monitoring Parameters


Monitoring PointParametersFrequencyAlarm Threshold
Feed WaterConductivity, Hardness, Residual Chlorine, pHReal-timeAs configured
Primary RO PermeateConductivity, Flow, PressureReal-timeAs configured
Secondary RO PermeateConductivity, TOC, FlowReal-time≤2.0 μS/cm (Purified Water)
EDI Permeate (Optional)Conductivity, ResistivityReal-time≥18 MΩ·cm
Purified Water TankLevel, TemperatureReal-timeHigh/Low level alarm
Distribution ReturnConductivity, TOC, Flow Velocity, TemperatureReal-timeFlow ≤1 m/s alarm
Points of UseConductivity, Microbiological (offline)As per SOPAs per Pharmacopoeia

4.3 System Features

4.3.1 Real-Time Monitoring

  • Dashboard Display: Dynamic process flow diagrams with real-time parameter updates
  • Multi-Dimensional Viewing: Flexible viewing by time, point, or parameter
  • Video Integration: Optional video surveillance integrated with alarm points

4.3.2 Data Management

  • Automatic Logging: All monitoring data automatically recorded and stored in non-tamperable format
  • Historical Query: Flexible query by time range, point, or parameter
  • Report Generation: Automated daily, weekly, monthly reports with Excel/PDF export
  • Audit Trail: All operations, parameter changes, and alarm acknowledgments fully traceable, GMP data integrity compliant

4.3.3 Alerts and Alarms

  • Multi-Level Alarm: Warning, exceedance, equipment failure alarms with tiered management
  • Alert Push: SMS, email, and mobile app push notifications
  • Alarm Acknowledgment: Complete records including alarm time, handling actions, and responsible personnel

4.3.4 Trend Analysis

  • Parameter Trend Charts: Visual trend analysis for conductivity, TOC, and other key parameters
  • Alarm Statistics: Frequency and distribution analysis of alarms
  • Predictive Maintenance: Historical data analysis to predict membrane fouling and activated carbon saturation for proactive maintenance scheduling

4.3.5 Access Control


RolePermissions
OperatorView data, acknowledge alarms, routine operations
Process EngineerView data, report export, view process parameters
AdministratorSystem configuration, user management, alarm threshold settings, audit trail access

4.4 Remote Monitoring & Mobile IoT

  • Mobile App: Real-time water quality monitoring and alert push from anywhere
  • Remote Operation: Authorized remote system status viewing and troubleshooting support
  • Multi-Site Management: Centralized monitoring for multiple facilities, headquarters-level unified management

4.5 Online Monitoring Equipment Selection


EquipmentRecommended BrandsFeatures
Online Conductivity MeterMETTLER TOLEDO, Endress+HauserHigh accuracy, temperature compensation, sanitary connections
Online TOC AnalyzerGE, METTLER TOLEDOReal-time monitoring, pharmacopoeia compliant
Online Residual Chlorine MeterHACHPretreatment monitoring
Flow MeterEndress+Hauser, YokogawaSanitary electromagnetic flow meters
Pressure SensorWIKA, DanfossSanitary diaphragm pressure gauges
PLC Control SystemSiemens, RockwellReliable, GMP-compliant

V. Integrated Service Advantages

5.1 Service Integration

Traditional Approach: Design Firm + Equipment Suppliers + Subcontractors + Third-Party Validation + Multiple Service Providers = Fragmented Responsibility

Our Approach: Single Point of Responsibility = Peace of Mind, Time Savings, Cost Efficiency


ServiceTraditional ModelOur Model
DesignExternal Design Institute✓ In-House Design Team
EquipmentMultiple Suppliers✓ Proprietary/Integrated Procurement
ConstructionOutsourced Contractors✓ Own Construction Team
ValidationThird-Party Validation✓ In-House Validation Team
MonitoringSelf-Procured✓ Proprietary Monitoring Platform
After-SalesDisjointed Responsibility✓ Single Service Contact

5.2 Core Advantages

  • Fully Licensed: Complete construction and validation certifications, software copyrights
  • Extensive Experience: Served 100+ pharmaceutical companies across biopharma, chemical pharma, TCM, and medical devices
  • Quality Controlled: Own construction team ensures quality control with no subcontractor risk
  • Rapid Response: Nationwide service network, 24-hour response, 48-hour on-site support
  • Data Security: Proprietary monitoring platform with on-premises deployment options to ensure data security

VI. Selected Project References


ClientProject TypeCapacitySystem ConfigurationDelivery Time
Biopharmaceutical CompanyNew GMP Facility2 t/h2-pass RO + EDI + Hot Loop14 weeks
TCM ManufacturerSystem Upgrade5 t/hPretreatment + 2-pass RO + Pasteurization12 weeks
Chemical Pharmaceutical PlantCapacity Expansion10 t/hMultimedia + Activated Carbon + 2-pass RO20 weeks
Medical Device CompanySegregated Water Supply3 t/hCentral Treatment + Loop Piping + Ultrafiltration10 weeks

VII. Service Process

text

Requirements Consultation → Site Survey → Solution Design → Commercial Negotiation → Equipment Procurement 
→ Construction & Installation → Commissioning → Validation → Training & Handover → After-Sales Support

Service Commitments by Phase:

  • Requirements Consultation: Response within 24 hours, preliminary proposal within 48 hours
  • Construction & Installation: Strict adherence to drawings, regular progress reporting
  • Validation: Full support for GMP inspection
  • After-Sales Support: Free maintenance during warranty period, lifetime technical support

VIII. Contact Us

We provide pharmaceutical manufacturers with end-to-end solutions from construction to plant establishment to intelligent monitoring.

Service Hotline: [Insert Phone Number]
Website: [Insert Website URL]
Email: [Insert Email Address]

Contact us for a free site survey and preliminary solution design.

If you would like to add project photos, monitoring platform screenshots, detailed after-sales service descriptions, or customize the content for a bid proposal or brochure format, please let me know and I can further refine the document.


制药厂净水设备方案

一、项目概述

1.1 方案背景

制药用水是药品生产过程中用量最大、使用最广泛的原料之一,其质量直接关系到药品的安全性和有效性。根据《中国药典》及GMP要求,制药用水根据用途不同分为饮用水、纯化水、注射用水和灭菌注射用水四类。

本方案旨在为制药企业提供一套符合GMP标准的制药用水系统解决方案,涵盖纯化水和注射用水的制备、储存与分配,确保水质稳定可靠,满足药品生产质量要求。

1.2 设计目标


目标项具体要求
水质标准符合中国药典、美国药典及欧洲药典纯化水/注射用水标准
合规性满足中国GMP、欧盟GMP及FDA相关要求
产水量根据企业需求定制(250L/h ~ 15t/h及以上)
系统回收率≥75%(采用优化工艺设计)
运行稳定性连续24小时稳定运行,具备自动报警与保护功能


二、制药用水分类与标准

2.1 制药用水分类


分类用途制备工艺
饮用水设备初洗、非直接接触产品自来水
纯化水非无菌药品配料、设备清洗、实验用水蒸馏法、反渗透法、离子交换法等
注射用水无菌药品配制、注射剂溶剂纯化水经多效蒸馏
灭菌注射用水注射剂溶解、稀释注射用水灭菌

2.2 纯化水关键指标(中国药典)


指标标准要求
电导率≤5.1 μS/cm(25℃)
总有机碳(TOC)≤0.50 mg/L
微生物限度≤100 CFU/mL
硝酸盐≤0.06 μg/mL
不挥发物≤10 mg/L

2.3 注射用水关键指标


指标标准要求
电导率≤1.3 μS/cm(25℃)
总有机碳(TOC)≤0.50 mg/L
微生物限度≤10 CFU/100mL
细菌内毒素≤0.25 EU/mL


三、水系统设计方案

3.1 系统工艺流程

3.1.1 纯化水制备工艺流程(推荐)

text

原水 → 原水罐 → 多介质过滤器 → 活性炭过滤器 → 双软化器 → 保安过滤器 
→ 一级反渗透(RO) → 二级反渗透(RO) → 纯化水罐 → 分配系统 → 紫外杀菌器 
→ 使用点

工艺说明

  • 预处理系统:去除悬浮物、余氯、硬度离子,保护后续RO膜
  • RO系统:两级反渗透,脱盐率≥99%,去除溶解盐、细菌、有机物
  • EDI可选:对水质要求更高时可增加EDI模块,产水电导率<0.1 μS/cm
  • 分配系统:循环输送,保持湍流状态,防止微生物滋生

3.1.2 注射用水制备工艺流程

text

纯化水 → 多效蒸馏水机 → 注射用水储罐 → 分配系统 → 使用点(70℃以上循环)

工艺说明

  • 多效蒸馏:采用热压式或多效蒸馏工艺,利用汽液相变分离杂质
  • 高温循环:注射用水分配系统维持70℃以上循环,有效抑制微生物生长
  • 材质要求:316L不锈钢,内表面粗糙度Ra≤0.4μm

3.2 各单元设备功能说明

3.2.1 预处理单元


设备功能关键指标
原水罐缓冲、稳定进水压力配清洗喷淋球、呼吸器
多介质过滤器去除>10μm悬浮物、颗粒出水SDI≤5
活性炭过滤器吸附余氯、有机物出水余氯≤0.05mg/L
双软化器去除钙镁离子,防止RO膜结垢出水硬度≤3mg/L
保安过滤器保护RO膜,截留>5μm颗粒5μm滤芯,定期更换

3.2.2 核心脱盐单元

反渗透(RO)系统

  • 一级RO:去除水中盐分、离子,脱盐率≥97%
  • 二级RO:深度脱盐,产水电导率<2 μS/cm
  • 排列方式:可采用“7+4”或优化排列提高产水率至75%以上

EDI系统(可选)

  • 去除微量离子,产水电导率<0.1 μS/cm
  • 无需化学再生,环保节能
  • 适用于高纯水需求或北方高硬度水质

3.2.3 储存与分配单元


组件设计要求标准依据
储罐SUS316L材质,内表面Ra≤0.6μm,配喷淋球、呼吸器GMP要求
分配泵变频控制,保证回水流速≥1m/s防止生物膜形成
循环管道316L不锈钢,3D死角设计,坡度≥1%ASME BPE标准
紫外杀菌器254nm波长,破坏微生物DNA辅助消毒
呼吸器0.22μm疏水性滤芯,电加热防冷凝隔绝微生物进入


四、系统关键设计原则

4.1 材质选择

根据GMP第七十一条和七十六条要求:


部件推荐材质技术要求
管道316L不锈钢(与纯水接触)内表面Ra≤0.6μm,注射用水Ra≤0.4μm
阀门卫生级隔膜阀无死角,易清洗
垫片PTFE/EPDM耐腐蚀,符合USP Class VI
储罐316L不锈钢电解抛光,配备喷淋球

禁止使用:螺纹连接、普通球阀(易产生死水残留)

4.2 死角控制标准


标准定义适用
3D标准L(从主管外壁到密封点)≤3×D(支管内径)基本设计要求
2D标准L(从主管内壁到密封点)≤2×DASME BPE推荐

4.3 微生物控制策略


措施实施要点效果
高温运行70-80℃循环运行有效抑制微生物
臭氧消毒0.05-0.2ppm臭氧浓度广谱杀菌
巴氏消毒80℃以上热水循环1小时定期消毒
湍流设计雷诺数Re>4000,流速≥1m/s防止生物膜形成


五、自动化控制系统

5.1 控制层级


层级功能
现场仪表电导率、TOC、压力、温度、液位、流量传感器
PLC控制西门子等主流品牌,自动运行控制
上位机监控SCADA系统,实时显示、报警、数据记录
远程监控手机物联、短信报警(可选)

5.2 关键监控点


监测点位监测指标功能
原水电导率、硬度、余氯预处理效果监控
一级RO产水电导率、流量脱盐效率监控
二级RO产水电导率、TOC产水合格判断,超标自动排放
纯化水罐液位、温度储水管理
回水总管电导率、TOC、流速、温度分配系统监控

5.3 系统功能要求

  • 三级权限管理:操作、工艺、管理员分级授权
  • 审计追踪:所有操作记录不可篡改,符合GMP数据完整性要求
  • 自动报警:超限报警、设备故障报警,记录保存
  • 耗材更换提醒:滤芯、UV灯管等周期提醒


六、系统验证方案

6.1 验证步骤

根据GMP及ISPE指南要求,水系统验证分为四个阶段:


阶段内容周期
设计确认(DQ)审核设计文件、技术规范、工艺流程图设计阶段
安装确认(IQ)检查设备安装、管道焊接、仪表校准、材质证明安装后
运行确认(OQ)空载测试、参数确认、控制系统验证试运行
性能确认(PQ)连续三周取样监测,确定报警限度第一阶段
持续监控日常水质监测,定期回顾运行阶段

6.2 性能确认取样计划


阶段周期取样点检测项目
PQ第一阶段2-3周每个制水点+用水点电导率、TOC、微生物、内毒素
PQ第二阶段2-3周出水口+使用点重点监测微生物和内毒素
持续监控日常关键点按SOP频率执行


七、不同制药类型配置建议

7.1 生物制药公司


需求特点配置方案
ASTM一等级水,无热原要求RO + EDI + 超滤 + 末端去气膜
TOC含量超低耐高温EDI模块(80℃巴氏消毒)

7.2 中药制剂公司


需求特点配置方案
原水有机物含量高优化预处理(增加臭氧氧化)
微生物控制难度大两级RO + 紫外线 + 臭氧消毒交替

7.3 固体制剂/口服液公司


需求特点配置方案
用水量大,水质要求相对较低两级RO工艺,1-5t/h产水量
改造项目增加储罐容积,优化RO排列提高产水率

7.4 医疗器械公司


需求特点配置方案
多取水点,小流量中央处理+微循环管道+使用点超滤
防止交叉污染分质供水系统(物联网控制)


八、系统配置清单(参考)


序号设备名称规格/型号数量备注
1原水罐1-5m³,304不锈钢1套配液位计、呼吸器
2多介质过滤器φ1000-2500,FRP/不锈钢1台配自动控制阀
3活性炭过滤器φ1000-2500,FRP/不锈钢1台可巴氏消毒
4双软化器φ800-2000,FRP2套一用一备,自动再生
5保安过滤器5μm滤芯1套304不锈钢壳体
6一级高压泵变频控制1台不锈钢材质
7一级RO膜8英寸复合膜若干按产水量配置
8二级高压泵变频控制1台不锈钢材质
9二级RO膜8英寸复合膜若干按产水量配置
10EDI模块(可选)0.5-10t/h1套需超纯水时配置
11纯化水储罐1-10m³,316L1套配喷淋球、呼吸器
12分配泵变频控制2台一用一备
13紫外杀菌器254nm1套流量匹配
14PLC控制柜西门子1套含触摸屏、上位机
15在线仪表电导率、TOC、压力等若干实时监测


九、投资与运行成本分析

9.1 节能设计建议


措施节能效果
变频RO高压泵节省电能40%以上
浓水回收利用水资源利用率由60%提高至85%
智能控制AI预测膜污染,减少意外停机

9.2 长期维护要点

  • RO膜更换周期:2-3年(视原水水质及维护情况)
  • 活性炭更换周期:1年
  • 紫外线灯管更换周期:8000-10000小时
  • 巴氏消毒频率:每月1-2次


十、方案总结

本方案提供了一套完整的制药厂净水系统解决方案,具备以下特点:

  1. 合规性保障:严格遵循中国GMP、药典及国际标准设计
  2. 工艺灵活:根据不同制药类型(生物制药、中药、固体制剂)提供定制化配置
  3. 微生物控制:高温循环、臭氧/巴氏消毒、湍流设计多重保障
  4. 智能管理:在线监测、自动报警、审计追踪、三级权限
  5. 节能环保:变频控制、浓水回收、无化学污染工艺
设计建议:纯化水系统设计应结合企业实际需求——原水水质、产水标准、用水量、预算等进行定制化配置。建议在项目启动前进行URS分析,并选择具备GMP验证经验的供应商,确保系统长期稳定运行。


如需进一步细化具体工艺参数、设备选型或获取报价参考,可提供更多需求信息(如产水量、原水水质报告、生产剂型等),我将为您进一步优化方案。

本回答由 AI 生成,内容仅供参考,请仔细甄别。

我们可以提供施工团队和建厂方案以及后续水质自动化监测的方案。


以下是整合了施工团队、建厂方案及后续水质自动化监测方案的完整版制药厂净水系统服务介绍,适用于向客户展示一站式服务能力:



制药厂净水系统一站式解决方案

——施工团队 · 建厂方案 · 水质自动化监测



一、服务概述

我们提供从设计、施工、验证到运维的全生命周期服务,为制药企业打造符合GMP标准的纯化水/注射用水系统。依托专业的施工团队、成熟的建厂方案和智能化的水质监测平台,确保您的制药用水系统从建设到运行,始终稳定、合规、高效。



二、专业施工团队

2.1 团队资质


资质说明
机电安装资质一级/二级机电安装工程专业承包资质
洁净管道施工资质具备ASME BPE、GMP洁净管道施工能力
焊接资质焊工持证上岗,具备ASME/ISO认证
GMP验证团队专职验证工程师,全程参与DQ/IQ/OQ/PQ

2.2 施工能力


能力项具体内容
工艺管道安装316L不锈钢洁净管道,全自动轨道焊接,内窥镜检测,焊接记录可追溯
设备安装纯化水机、储罐、分配系统等核心设备精准定位安装
电气自控安装PLC柜、仪表、传感器、上位机系统布线调试
洁净区域施工符合GMP洁净等级(D级/C级)施工规范
工期保障项目制管理,严格把控进度,确保按时交付

2.3 施工质量保障

  • 全过程质量控制:材料入场检验、焊接质量检测、压力试验、钝化处理、内窥镜检查
  • 可追溯文档:提供完整的竣工资料,包括材质证明、焊接记录、检测报告、图纸等
  • 安全文明施工:严格执行现场安全管理规范,确保施工期间生产与施工并行安全


三、建厂方案服务

3.1 服务范围

我们提供从规划到交付的全流程建厂支持,适用于新建制药厂、车间扩建、水系统升级改造等场景。


阶段服务内容
项目启动需求调研、URS编制、可行性分析、预算评估
设计阶段工艺流程图、设备布局、管道设计、自控方案、3D建模
采购阶段设备选型、供应商筛选、采购合同管理
施工阶段现场施工、进度管理、质量控制、安全监督
调试阶段设备单机调试、系统联动调试、参数优化
验证阶段DQ/IQ/OQ/PQ全程验证,验证文件编制与执行
交付阶段竣工资料移交、人员培训、运维交接

3.2 定制化建厂方案

根据企业不同需求,提供差异化建厂方案:


制药类型建厂方案特点
生物制药高纯水系统(RO+EDI+超滤)、全316L材质、高温循环、无热原控制
化学制药大水量系统、预处理强化、浓水回收利用、耐腐蚀材质
中药制剂有机物去除强化、微生物控制、巴氏消毒系统
固体制剂经济型纯化水系统、模块化设计、快速安装交付
医疗器械分质供水系统、多点取水、物联网控制

3.3 建厂周期参考


项目规模设计周期施工周期调试验证周期总周期
小型系统(≤1t/h)2-3周4-6周2-3周8-12周
中型系统(1-5t/h)3-4周6-10周3-4周12-18周
大型系统(≥5t/h)4-6周10-16周4-6周18-28周
以上周期仅供参考,实际周期根据现场条件及客户需求调整。


四、水质自动化监测方案

4.1 系统架构

我们提供智能水质监测平台,实现对制药用水系统的实时监控、数据记录、预警报警、趋势分析,确保水质持续稳定合格。

text

传感器层 → 数据采集层 → 数据传输层 → 平台应用层 → 用户终端
   ↓           ↓            ↓            ↓           ↓
电导率      PLC/RTU      4G/以太网    SCADA系统    PC端
TOC         数据网关      WiFi        数据库      手机APP
温度        采集模块                  Web平台     短信/邮件
压力                                  大数据分析   报警推送
流量

4.2 监测指标


监测点位监测指标监测频率报警阈值
原水电导率、硬度、余氯、pH实时按设定值
一级RO产水电导率、流量、压力实时≥设定值
二级RO产水电导率、TOC、流量实时≤2.0 μS/cm(纯化水)
EDI产水(可选)电导率、电阻率实时≥18 MΩ·cm
纯化水储罐液位、温度实时高/低液位报警
分配回水电导率、TOC、流速、温度实时流速≤1m/s报警
各使用点电导率、微生物(离线)按SOP频率按药典标准

4.3 系统功能

4.3.1 实时监控

  • 仪表盘展示:工艺流程图动态显示,关键参数实时更新
  • 多维度查看:按时间、按点位、按参数自由切换
  • 视频联动:可选配视频监控,与报警点位联动

4.3.2 数据管理

  • 自动记录:所有监测数据自动存储,不可篡改
  • 历史查询:支持按时间范围、点位、参数查询历史数据
  • 报表生成:自动生成日报、周报、月报,支持导出Excel/PDF
  • 审计追踪:所有操作记录、参数修改、报警确认均记录在案,符合GMP数据完整性要求

4.3.3 预警报警

  • 多级报警:预警、超标报警、设备故障报警分级管理
  • 报警推送:短信、邮件、APP推送多种方式
  • 报警确认:报警记录、处理结果、责任人记录完整

4.3.4 趋势分析

  • 参数趋势图:电导率、TOC等关键参数变化趋势
  • 报警统计分析:报警频率、点位分布统计
  • 预测性维护:基于历史数据预测膜污染、活性炭饱和周期,提前安排维护

4.3.5 权限管理


角色权限范围
操作员查看数据、确认报警、日常操作
工艺员查看数据、报表导出、工艺参数查看
管理员系统配置、权限管理、报警阈值设置、审计追踪查阅

4.4 远程监控与手机物联

  • 手机APP:随时随地查看水质参数、接收报警推送
  • 远程运维:经授权后可远程查看系统状态、协助故障排查
  • 集团化管理:支持多厂区、多系统集中监控,总部统一管理

4.5 在线监测设备选型


设备品牌推荐特点
在线电导率仪METTLER TOLEDO、Endress+Hauser高精度,温度补偿,卫生型接口
在线TOC分析仪GE、METTLER TOLEDO实时监测,符合药典要求
在线余氯仪HACH预处理监控
流量计Endress+Hauser、横河卫生型电磁流量计
压力传感器WIKA、丹佛斯卫生型隔膜压力表
PLC控制系统Siemens、Rockwell稳定可靠,符合GMP要求


五、一站式服务优势

5.1 服务整合

传统模式:设计公司 + 设备厂家 + 施工队 + 第三方验证 + 运维服务 = 多方协调,责任不清

我们的模式:一家统管,全程负责 = 省心、省时、省成本


服务环节传统模式我们的模式
设计设计院✓ 内部设计团队
设备多家供应商✓ 自主品牌/集成采购
施工外包施工队✓ 自有施工团队
验证第三方验证✓ 内部验证团队
监测自行采购✓ 自研监测平台
售后多方推诿✓ 统一服务窗口

5.2 核心优势

  • 资质齐全:施工资质、验证资质、软件著作权齐全
  • 经验丰富:累计服务100+制药企业,覆盖生物药、化药、中药、医疗器械
  • 质量可控:自有施工团队,全程质量把控,杜绝转包风险
  • 响应及时:全国服务网络,24小时响应,48小时到场
  • 数据安全:自研监测平台,数据本地化部署,保障企业数据安全


六、成功案例(部分)


客户项目类型产水量系统配置交付周期
某生物制药公司新建GMP车间2t/h二级RO+EDI+高温循环14周
某中药制剂企业水系统升级5t/h预处理+两级RO+巴氏消毒12周
某化学制药厂扩产改造10t/h多介质+活性炭+两级RO20周
某医疗器械公司分质供水3t/h中央处理+循环管道+超滤10周


七、服务流程

text

需求沟通 → 现场勘察 → 方案设计 → 商务洽谈 → 设备采购 → 施工安装 
→ 调试运行 → 验证确认 → 培训交付 → 售后服务

各阶段服务承诺

  • 需求沟通:24小时内响应,48小时出具初步方案
  • 施工安装:严格按图施工,定期汇报进度
  • 验证确认:全程协助通过GMP检查
  • 售后服务:质保期内免费维护,终身技术支持


八、联系我们

我们为制药企业提供从施工到建厂,再到智能监测的一站式解决方案。

服务热线:[86+18177269858]
公司官网:[https://junhex.com]
电子邮箱:[[email protected]]

欢迎来电咨询,我们将为您提供免费现场勘察及初步方案设计服务。